502 views
Before the cold weather sets in, I plan to first of all complete the facade work, and also, if the weather permits, finish the winding of the house. 0:00 Introduction 1:57 Start of installation 2:58 Drawing 5:12 Covering the rafter leg with siding 8:17 Result of the work 8:38 Blind area 9:17 Preparation 10:20 Formwork 11:44 Hurricane wind. But we continue 12:34 Broken brick foundation 13:00 Concrete mixer 14:28 Result of the work