93,060 views
Blasting of houses due to the construction of the Nuselský bridge (1965) — Preparatory construction work (1967) — Slow work at the construction site near the Main Railway Station (1968) — A massive tunnel boring machine (1969) — The first tunnel from the Nuselský bridge to Heroes' Square completed (1969) — How is the construction of the first metro line progressing? (1970). — Securing the north tower of the National Museum building (1977) — Current status of works on Můstok and Wenceslas Square (1977) — Installation of a stair lift at Malostranská station (1977) — Installation of air conditioning on line 1A (1978) — Stations on route 1A (1978) — Construction workers' day: tour of the future Cosmonaut station (1980) — Construction of the tunnel on route C3 near the Hlávkova bridge (1980) — Brigadiers clean up the Cosmonaut station (1980) — If the punchers can't get food, the food has to get to them (1980) — Completion of the Flora station ( 1980) — Construction of route C: work on Štvanice (1980) — Rough construction of Vltavská station completed (1983) — Replacement of information boards with current ones (1984) — Modification of the surroundings of Vltavská station (1984) — Transport of escalator for route B (1985) — Settlement and installation of an escalator (1985) — Repairs to the facades of houses around the stations (1985) — Greenery around the stations (1985) — Last blasting on route 2B (1989) — New bridge between Hůrka and Lužiny stations (1994) — Repair of the steel grating inside Nuselský of the bridge (1998)