2,029 views
Installation of a plasterboard ceiling after redevelopment of the premises. The ceiling levels the plane in several combined rooms and hides wooden beams. Plus one plasterboard box for zoning a large hall and maintaining the height of the ceiling in the main part of the room. The frame is assembled according to a two-level scheme, the main profiles with a step of 75 cm, the bearing ones with a step of 40 cm, corners for fastening and aligning the frame, sheathing with moisture-resistant plasterboard 12.5 mm in one layer. #plasterboardceiling #frameforceiling #plasterboardinstallation #two-levelframe