Moving 1,400 tons of concrete the size of a '20-story apartment' onto a bridge under construction│How was Incheon Bridge, the 'highway over the sea', built?│Using cutting-edge civil engineering technology! Incheon Bridge│Docuprime│

2,234,326 views

EBS Documentary

Published on Dec 9, 2022
About :

※ This video is part of the <Documentary Prime - Wonderful Science: Advanced Engineering Running on the Sea, Incheon Bridge> broadcast on January 1, 2009. A mega-project that broke all the best records in the history of bridge construction in Korea. Incheon Bridge, which is steadfastly building the future of Korea even in the midst of an economic crisis that has hit the world hard. The total length of the 12.3km sea section and the connecting road is 21.3km, making it the 6th largest in the world. The distance between the main towers of Incheon Bridge is 800m, making it the 5th largest in the world. The given construction period was only 52 months. We visit the amazing construction site that had to be built in the shortest period of time in the history of bridge construction in Korea compared to the longest bridge length in Korea and predict the present and future of bridge technology in Korea. 1. Advanced engineering that made the impossible possible Incheon Bridge, the longest cable-stayed bridge in Korea with a sea section of 12.3km. It seemed impossible to build this huge project in the short period of 52 months. The water level difference between high and low tides is up to 9m in the sea off Incheon. Fog and wind are also obstacles to bridge construction. The average monthly work days are only 20, and the conditions are harsh. However, it was the introduction of various cutting-edge construction methods that made the impossible a reality. Various cutting-edge engineering techniques were used in the construction of Incheon Bridge, such as the Fast Track method, in which design and construction are done simultaneously, and the FSLM (Full Span Launching Method), in which the ultra-large deck required for bridge construction is manufactured on land in advance and used for bridge construction. 2. Changing the history of bridges in Korea The height of the main tower, which is the core of Incheon Bridge, reaches 238.5m. It is close to the height of the 63 Building in Yeouido and is much taller than the main towers of Seohae Bridge and Yeongjong Bridge. Various cutting-edge technologies were used to build this main tower, such as rapid construction using automatic rising formwork and high-pressure concrete conveying equipment before the concrete hardens. When constructing the foundation of the main tower, instead of the common method of blocking water to construct the foundation, 24 iron piles with a diameter of 3m were used to shorten the construction period. The pile load test for driving these piles also holds a record of 30,000 tons. In addition, the collision protection work to prepare for accidents that may occur when ships pass by is also the largest in the world. 3. There are people who only work at night The total length of the cable-stayed bridge cables of Incheon Bridge is 53km, the longest in Korea. Although the thickness of a single cable is only 9.7cm to 15.3cm, it is designed to be sturdy enough to withstand a weight of 2,000 tons. The cable-stayed bridge cable construction and deck construction are carried out simultaneously on the east and west main towers and meet in the middle of the sea. An important technology at this time is linear control. It is the most important technology because the tension applied to the cables and the location of the deck must match the design in order to fit perfectly when connecting the last deck of the cable-stayed bridge. To this end, the construction team only works at night. Why? 4. Finally, the last deck of the cable-stayed bridge is connected. December 16, 2008 is a historic day in the construction of Incheon Bridge. This is because it is the day when the last deck of the cable-stayed bridge is connected. It took more than an hour just to put the last deck together. It shows that the construction over the past four years was not easy. The construction workers watched the site anxiously for this day. Finally, the deck was connected, and Songdo New City in the east and Yeongjong Island in the west were connected as one. This is the result of the sweat of 230,000 technicians. 5. Cable-stayed bridges and suspension bridges In the construction of large-scale bridges in the sea where ships frequently come and go, the key technology is to increase the span between piers. The representative bridges that can increase the span are suspension bridges and cable-stayed bridges. A suspension bridge is a bridge designed to hang the deck from a main cable, which is then supported by the main tower. A cable-stayed bridge is a modified form of a suspension bridge. Instead of fixing the main cables to both ends of the bridge, the cables are fixed to the top of the main tower and support the deck, with the cables connected to the main tower. Let's find out the differences through suspension bridges and cable-stayed bridges built in Korea and abroad. ✔ Program name: Docuprime - Wonderful Science Advanced engineering running on the sea, Incheon Bridge ✔ Broadcast date: 2009.01.01 #Docuprime #Construction #Architecture #Industry #Science #Engineering #Construction method #Civil engineering #Technology #Bridge #Machine #Korea #korea

Trend Videos
11:34
1,960,203 views   12 days ago
8:05
2,017,176 views   2 days ago
10:21
4,057,511 views   9 days ago
58:52
553,834 views   5 days ago
10:21
4,057,511 views   9 days ago
9:37
3:45
610,078 views   4 days ago
3:45
610,078 views   4 days ago
58:52
553,834 views   5 days ago
8:05
2,017,176 views   2 days ago
Google AdSense
336 x 280
Up Next
14:00
Jonathan Liandi
785,873 views
7 months ago
24:06
Sebastian Tedy
620,876 views
7 days ago
15:58
Sebastian Tedy
40,656 views
3 hours ago
Mobile Legends : Bang Bang Indonesia

18:25
R7 Tatsumaki
1,368,094 views
5 months ago
18:13
erbos cz
30,381 views
1 day ago
25:25
MM Automotive
36,701 views
3 weeks ago
35:54
David Drobík
204,142 views
1 month ago
22:33
14:01
VASYL SERVICE
4,238 views
3 days ago
13:37
Auto ESA
31,362 views
2 weeks ago
12:41
17:45
volant.tv
37,084 views
11 days ago
33:49
Jiří Hampl - diagnostika
14,845 views
1 year ago
24:39
Ukaž Káru Official
164,136 views
5 days ago
28:53
erbos cz
69,865 views
10 days ago
26:16
CarAntiLab
37,396 views
2 weeks ago
Google AdSense
336 x 280

fetery.com. Copyright 2024