15,336 views
The construction of the Modernization of line No. 149 Karlovy Vary lower station - Mariánské Lázně is to ensure an increase in track speed and a reduction in travel time. The construction includes the modernization of 27 km of railway top and bottom, reconstruction of 25 crossings, 54 culverts, 19 bridge structures and 4 pieces of frame walls. The track and station security equipment will be existing, modified as necessary to the new condition.