2,973 views
NOTE: As one viewer rightly pointed out, the occupancy permit is issued by the PINB, not the starosty. PINB means the District Building Inspectorate. And to be precise, this is not an occupancy permit, but a certificate of no objection to the use of the facility. We have finished construction, what next? How to obtain an occupancy permit? What documents are needed for a house occupancy permit. In order to be able to live in the house and register in it, you must obtain an occupancy permit from the district starosty. In this film, I present all the documents necessary to obtain such a permit. 00:00 - entry and dismantling of the yellow information board 02:53 - water laboratory test report 03:45 - assignment of a registration number at the commune/city office 04:17 - building energy performance certificate 04:56 - electrical measurement report 05:23 - technical report of a sewage treatment plant tightness test 05:41 - sewage treatment plant or septic tank delivery and acceptance report 05:58 - heating system tightness test report, underfloor heating system tightness test report 06:15 - water system tightness test report 06:35 - heat pump tightness report 06:58 - post-construction geodetic inventory 07:30 - waste collection declaration 07:44 - ventilation acceptance report from the chimney sweep 08:11 - original construction log 08:48 - occupancy permit from the State Fire Service 09:10 - original building permit 09:47 - technical construction design 10:05 - technical design of heating installation, underfloor heating 10:12 - technical design of electrical installation 10:35 - technical design of water and sewage installation 10:42 - technical design of roof truss installation 10:55 - thick binder of the above in paper version - binder of documents to be taken to the district office 13:24 - summary and ending