2,890 views
▶️Channel membership: / @adani12345 ▶️ My photography page: / albertdanifotok ▶️ Instagram: / a.dani0227 ▶️ Discord server / discord Would you like to support? ▶️ Paypal: https://paypal.me/Adani12345 ▶️ Patreon: / adani12345 ▶️ Mohu QR code: • Post ▶️Revolut: https://revolut.me/dnielpxhz Bank account: 10404247-93423860-01440000 Albert Dániel K&H bank Thanks to Attila Tóth for the logo: / attila.toth.badwolf This year I went out to look around the Southern Ring Road for the first time. This time I also looked at the area between 150th and Southern Ring Road at Mester Street for the first time, from a distance it looks like at least half of Budapest Park will be taken up by the railway track. At the Közvágóhíd stop, 4 tracks and two platforms need to fit. Two bridges of line 150 are also being built, one track has already been lifted there too. Earthwork is also underway at the Nádorkert stop, and after Szerémi út the retaining walls are almost all the way up, it is difficult to film from the street here. From here on, there will not be much of a spectacular work process, from the train's perspective, it will be more like the substructure will be continuously built at the built retaining walls, or. afterwards when the tracks are alternated, with connections here and there, 3 or 4 tracks need to fit there in some places and in the meantime, traffic will have to go on at least one, but preferably two tracks.