1,147,182 views
Initially, pour 10 ml of the preparation per 1 cubic meter of pool water. For example, a 10 cubic meter pool - the need for the preparation is 10 ml x 10 m3 = 100 ml of the preparation. • 2. Each subsequent week, add 5 ml of the preparation per 1 m3 of the pool volume. With an increase in the load on the pool, a slight increase in the consumption of the preparation is possible. In case of unforeseen circumstances, water from the pool can be safely and additionally drained onto the terrain (onto the lawn, vegetable garden, garden plot) without negative consequences for animals and plants, and discharge into the general sewer is also possible.