3,396 views
We are blogging for you about the construction of our new model railway system with Märklin mini-club in Z gauge. These videos are part of the blogs on https://www.schlagercity.de Today we are showing you how the tracks are glued and ballasted on the routes of level 1. The bridge is also integrated into the planned landscape. Then there were a few track connections that were not perfect. This was 100% fixed with a soldering iron, solder, file and sandpaper. The train can now do its first laps with the current state of the Z gauge system :-) Even though we are building with Märklin mini-club, our tips are relevant for all manufacturers and scales, because the experience with our Märklin H0 system can also be used well for building the Z gauge system, only the materials are then a little smaller. Have fun watching ...