4,003 views
This video lesson presents a mixed drilling report (SPT and rotary) together with its respective drilling bulletin related to a specific case of subsoil investigation for the purpose of dimensioning the foundations of a road construction (viaduct). Together with the description of the report, a detailed description of the results described in the drilling bulletin for one of the holes is provided.