19,018 views
Unloading sheet pile planks of 14.2 meters in the center of Amsterdam. a film with a trailer with steering axles is not an unnecessary luxury. The cooperation of the driver and supervisor of the steering axles. After unloading we go back to Amsterdam to load a High Cube container, and go on our way to Dordrecht, not via the usual route, we avoid the low viaducts thanks to information from people who know how to drive through the Netherlands at height. To the German Xanten to load T beams with a length of 16 meters. A day of avoiding traffic jams around Nijmegen, taking into account lengths and heights and good cooperation with supervisors.