512 views
Hello everyone, today another new construction video. The track construction crew has reached the station. Lots of switches and parallel tracks have to be "grounded" and wired here. In between, there are also a few glimpses of the construction site chaos during this time. And the planned functions of the individual sidings are shown. There were also a few new additions. You can tell because I haven't aged them yet. And everything is operated digitally by hand in the third Grainitz. The switches are set in the classic analogue way and have been given a frog polarization. After an extensive test run, the tracks are glued, rusted and ballasted. Enjoy watching! I wish you all a peaceful Advent season, a Merry Christmas and a Happy New Year! Ciao, Frank For the search engine: model railway, TT, branch line, terminus, Grainitz, DR, Epoch IV, model railway