37,085 views
The Görlitz tram runs on a 10.7 km long route network, which is served by lines 2 and 3. The service was opened in 1882. Both lines run every 20 minutes on weekdays, and on the shared section they combine to run every 10 minutes. Only KT4Ds are used on line 2 alone and on line 3 in double traction (except during the holidays). The journey time on lines 2 and 3 is around 25 minutes, and 17 stops are served. There are 3 courses on each line.