53,748 views
Our modern production facilities not only enable optimum quality. High-performance systems and robot systems are also the prerequisite for economical production with the lowest possible energy consumption and optimum use of materials. Prefabrication in the factory under optimal conditions means that our products are of a consistently high quality level. The basement assembly on site is divided into two phases: In phase 1, the drainage pipes are laid beneath the basement floor slab. This is followed by laying the reinforcement and concreting. These work steps take around 2 days*. As soon as the basement floor slab has developed a basic strength, the team can start phase 2 - the assembly of basement walls and ceiling elements. With the subsequent concreting and sealing of the basement on site, this phase takes around 3 to 4 days*. The duration depends on the design variant, size and scope of the object as well as weather conditions. ▬ Recommended videos ▬▬▬▬▬▬▬▬▬▬▬▬ Glatthaar Keller - the best basis for your house: ! • The best basis for your house Glatt... ▬ Social Media ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬ ► Instagram: / glatthaar_fertigkeller ► Facebook: / glatthaar.keller ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬ Subscribe to our channel now: / @glatthaar1