View of the structure (north portal) for the Brenner Base Tunnel in the Sill Gorge. The large retaining wall that was built in 2021 and the two railway bridges with the two entrances to the Villerberg are clearly visible. The slope that was specially removed for the construction of the preliminary tunnel was recently restored, and the almost completed preliminary tunnel now runs through it. © Rolf Parzer