21,498 views
Contact: 70 / 6 125-521 If you also need to solve the subsequent waterproofing. This building has tar waterproofing, but unfortunately it no longer worked, it completely crumbled to dust. That is why it was necessary to replace it and we chose the best solution currently available in my opinion, the high-pressure injection method. We also remeasured the results for quite a few buildings and there were spectacular differences. We will constantly check the values here as well. The next step in the process will be the application of foam glass or glass foam granules and its compaction. This will be followed by 8 cm of subgrade concrete.