53,795 views
Landscaping on a site with a slope: stages, deadlines, cost. Splitting the budget by time for complex sites simplifies the implementation of a landscaping project for customers. Using this object as an example, we demonstrate step by step how to optimally distribute the front of work over two seasons. The site is on a slope, the main problem is that water flows down the slope and washes away the soil. The first stage is the creation of a drainage system: we dig temporary interceptor ditches, lay underground pipes. Then - terracing (soil planning), preparing the base for the future: playgrounds, paths, parking, road. In the second season - redistribution of soil, formation of smooth slopes, backfilling of sand and fertile soil before sowing the lawn. We bring everything to the final appearance as planned in the landscape design of the site. Landscaping work completion period: 34 working days. Total cost: 3,345,000 rubles. Contact us: https://clc.to/zel.vector Telegram: https://clc.to/zelvector.telegram VK: https://clc.to/zel.vectorvk Instagram: https://clc.to/zel.vectorinst Phone: +7(911)925-41-63 Improvement and landscaping, clearing from overgrowth, backfilling and drainage of sites - all earthworks in St. Petersburg and the Leningrad region. Battery-powered garden equipment: https://accuma.ru/ 00:00 About the site on the slope 01:20 First inspection of the site, 2022 02:15 Inspection after part 1 of the work, 2023 03:20 Drainage and planning on a site with a slope 07:30 Embankment near the house and a curved slope 08:40 Entrance group 09:25 We set the shape of the site 12:50 Leveling and sowing the lawn 14:00 Result of the work 20:55 Cost and terms of work #site #dacha #terracing #backfill #planning #house #landscape #lawn #garden