257,621 views
⚡️ FREE CLASS: How to Do a Complete Electrical Installation from Scratch, Easily, Even if You Are Not a Professional Electrician: ➽ https://eletr.co/aula?utm_content=yt1... ------ ???? FAAALA ENGEHALL COMMUNITY ???? Join our community on WhatsApp to receive valuable tips and news in the electrical area, important information and much more. ???? ???? https://eletr.co/fala-eng?utm_content= ------ Did you like this video? ???? ✔️ Leave your comment and share with your friends ✔️ Follow our networks ➽ https://eletr.co/links - - - - - - - - - - - - - - - - - - - - - - - - - - - How to PIPE an ISOPOR SLAB in a SUPER EASY way Well, the piping part was Brener's responsibility. I climbed onto the slab just to show him the details of the project. Brener climbed up with all the PPE and with a lifeline set up, after all, he spent more time on the slab. And here is Brener getting ready to distribute the ducts. Note that because it is a slab of slab, we placed a 30 cm board so he could move better. Walking on the slab, guys, there is a secret, whether it is made of brick or styrofoam. Either you place boards to help you move or you just step on the concrete beams, because if you step off, you will fall badly. We measured the points and are cutting the Styrofoam to fit the box. The tip here is to mark the hole a little smaller so that the box fits in more tightly, this helps with the fixation. Also, cut it very carefully. Don't be so lazy as to break the Styrofoam. Most of the time, there are only a few spare parts. So, we continue to place the boxes. The first step is to distribute the boxes according to the center of the rooms. To do this, we measure the distance across the room and drill holes in the Styrofoam where it is half the distance measured with the tape measure. There you have it, three boxes for two rooms practically connected. Below, we have the kitchen and also the living room. No major problems so far. Let's see the rest of the distribution, first diverting the points to the distribution panel and then I'll show you how to connect the conduits to the octagonal box! Now I'm going to connect the kitchen box to the distribution panel. Basically, all the ducts come out of this point here. I like to measure from above and leave a surplus of approximately 2 meters for cutting, so that the ducts go down the wall and are just under 1 meter from the floor, enough to finish the distribution panel later. I round off the Styrofoam a little and adjust the conduit better, it should be flush with the wall, and we should cut it later to embed it. Since this is a renovation, I didn't make a belt in the middle of the house, I just made it around it, so I didn't leave any waiting for the electrical conduit, then I just cut into the brick and pass the ducts. I move the beam of the slab a little just to place the conduit, then we cut and embed it to fit the beam in place again. The connection in the box is simple. We use our fingers to break the 25mm hole in the box, which is already highlighted. I don't like to highlight everything. I always like to leave it attached to a part so that the duct fits in more tightly. I always put about 10 to 15cm of conduit inside. Then, when it's time to run the cables, we cut off the excess. Note that I always go back to the project and check that everything is going as planned. This is how our distribution looks. Now we have a good part of the slab piped. Note that I put wire in a few places. The right thing to do is to put it in a beam, skip one or two, and put it back in again. This prevents the hose from moving during the concreting. Tied up here, I left three ducts waiting for the upper floor. I will have a fourth one up here. I chose to leave conduit left over here to later make the connection between the panels. This part here where there are several conduits going up that I said we would break, as I said there is no beam there, I left it on the wall.