30,667 views
The Egy hely team visited two drinking water storage pools - each with a volume of 40,000 cubic meters - located in the bowels of Gellért Hill. 200 people participated in the construction of this engineering masterpiece in parallel, the pools are supported by 106 prestressed concrete columns each, the 10-meter pillars form a veritable forest inside the concrete colossus. The video was made possible with the support of MMA.