611,784 views
Toei Subway has installed platform doors at all 106 stations on 4 lines. At the time, it was estimated that installing platform doors would cost tens of billions of yen, making it difficult to implement. The solution to this problem was a new platform door system proposed by engineers at the Tokyo Metropolitan Bureau of Transportation. The system used was something very familiar. FNN Prime Online https://www.fnn.jp/