2,788 views
This is a report on the Meiji Irrigation Canal Headworks, photographed on October 22, 2022. The construction of the temporary road on the downstream side has passed the corner and is progressing. It is expected to become even taller in the future. On the upstream side, two crane barges were pouring sheet piles. Chemical injection was being carried out on the left bank. On the right bank, a work platform was set up on a uni-float. It is expected to be used as a platform for constructing a temporary bridge. #ryo's Uncle Walker #Meiji Irrigation Canal Headworks #Meiji Irrigation Canal #Yahagi River