1,635 views
This is a report on the Meiji Irrigation Canal Headworks taken on October 25, 2024. On the downstream side, a temporary road is being constructed. It has become thicker. On the upstream side, the second barge is just about to be installed with sheet piles poured. Sheet pile units will be installed at the P6 connection. The first barge was building the abutments for the corner of the temporary bridge. The bridge girder of the temporary bridge has already been completed on the right bank. #ryo's Uncle Walker #Meiji Irrigation Canal Headworks #Meiji Irrigation Canal #Yahagi River