27,817 views
We plan, deliver and professionally install the best private and industrial floor coating for your project! STEDFLOOR Online Shop - https://www.stedfloor-shop.de/ Approval for the use of ARTURO system and products in demo video. https://www.arturoflooring.de The right solution for every requirement. No two floors are the same. The environment, the location within the building and the stresses and strains combine to create an almost unmistakable requirement profile - from production to storage rooms, workshops to representative areas such as shops, schools, health centers, offices or apartments. Hardly any other floor covering can be tailored to individual needs as optimally as floors made of epoxy resin. The covering is built up layer by layer: First, the primer creates the monolithic connection to the substrate. The subsequent 3D floor coating ensures the desired floor properties, while the sealant provides an attractive appearance and additional protection. STEDFLOOR floor systems can be applied seamlessly. The result: a seamless, easy-to-clean surface with excellent durability. Another plus point: the coating can be used to create a cove at the floor/wall connection and the transition can be made seamless. Properties such as high chemical, mechanical or thermal resistance, slip resistance, UV stability or impact sound insulation can be tailored to the requirements of a property, as can special requirements such as electrical conductivity. The design options for STEDFLOOR floor systems are also limitless. Whether color, flakes/chips, concrete look, metallic floor, individual design or 3D floor - with STEDFLOOR every room gets the right feel-good ambience. System structure: Day 1 Setup and subsurface preparation. Arrival and departure, setting up the construction site, transport and provision of tools, equipment and other operating resources required to carry out the construction work in accordance with the contract. Subsurface preparation. Prepare and clean the floor surface. Remove all parts that are not sufficiently load-bearing using diamond grinding at the contractor's discretion, then sweep and vacuum the prepared surface, provide electricity on site (220V). Masking work. Different masking materials: adhesive tape, masking film and tarpaulin, film or paper masker, masking fleece, barrier tape. Priming the floor surface. Apply to the prepared surface, transparent and solvent-free 2-K Arturo EP6700 primer. Primer consumption approx. 0.4 kg/m² + approx. 0.2-0.3 kg/m² quartz sand 0.3-0.8mm. Day 2 Scratch filler. Apply to the prepared surface, colored and solvent-free 2-K Arturo EP6200 scratch filler. Consumption approx. 0.8-1.0 kg/m². Day 3 Flow coating. Apply to the prepared surface, colored and solvent-free 2-K Arturo EP2500 floor coating. Consumption approx. 2.5 kg/m². RAL color 7036 platinum gray. 1 mm on request. colored flakes (chips) black/white/gray sprinkled in free of charge. Day 4 Slip-resistant satin finish. Apply to prepared surface, transparent and solvent-free 2-K Arturo EP3950 finish. Slip resistance class R10. You can find more information about our floor coatings on my homepage: http://stedfloor.de/dienstleistungen/ Hello dear viewers, if anyone wants to get a master craftsman's certificate or something similar and needs techniques for wall design, they are welcome to use my techniques and apply them in the exam. Be sure to watch my other videos on the subject of wall design, and leave a like and subscribe if you liked the video and activate the bell so you don't miss any more videos. Brand name: STEDFLOOR Owner. Igor Sperling Bukarester Weg 5 67069 Ludwigshafen Homepage: https://www.stedfloor.com/ Telephone: Tel.: 0621-59285448 Mobile: 0157-74182985