2,730 views
We are following the construction of the elevated track at Kasukabe Station. This video was filmed on Saturday, December 14, 2024. Road replacement has begun near the temporary track site of the Noda Line. The Noda Line points have also begun to be removed. The construction of the temporary down platform at Kasukabe Station is progressing. The overhead poles have been replaced with temporary ones. The narration is by "VOICEVOX Kasukabe Tsumugi".