13,042 views
On January 27, 2024, there was a lot of activity at the Veluwsche Stoomtrein Maatschappij in Beekbergen. Here, the 2412 was tested and the 532 was picked up from the workshop in Apeldoorn. The latter locomotive will be finished in Beekbergen in the near future, after which it can return to service on the Koningslijn. The 2233 traveled to Loenen for infrastructure work and returned with a freight wagon. Due to work on the turntable drive, it had to be operated with muscle power. A great day to test my brand new video camera. Web: https://www.ng-railways.nl/ Facebook: / ngrailways Instagram: / ng_railways A disclaimer applies to this video. Read the full text at https://ng-railways.nl/Disclaimer/ 00:00 Intro 00:25 Shunting with the 636 02:40 Starting Sik 307 3:55 Shunting with the 307 8:20 Atmospheric images VSM 2412 8:53 Shunting with the 636 10:15 Shunting with the 636 and 2412 12:16 636 departs towards Apeldoorn Workshop seen from the Nieuwe Voorweg 13:38 Shunting 2233 with the 2412 15:44 Departure 2233 towards Loenen 16:22 starting attempts 2412 21:43 Atmospheric impressions 2412 23:10 Shunting with the 636 23:54 Shunting with the 636 and 2412 25:21 Arrival 2233 in Beekbergen from Loenen 26:43 Outro