216,615 views
A video camera inspection of the well bore revealed: the static water level is at a depth of 36 m. At a depth of 45, 55 and 68 m there is perforation in the plastic column, which indicates that during the drilling of the well, different aquifers were combined (possibly to increase the well flow rate). The stuck pump is at a depth of 80 m. More details here https://www.burgp.ru/remont_art__skva...