2,321 views
It continues at the Stockstadt entry signal. The line received an electronic control system not too long ago, but they were not progressive and raised the number of blocks. Luckily I'm not ahead of anything, I know this line and the volume of traffic differently. In Kranichstein it goes north over the freight line and continues towards Groß Gerau. Shortly before Bischofsheim there is a network separation point where the main switch has to be turned off when passing through. After a short stop at the entry signal it then goes through the freight yard and past the passenger station. Have fun :)