21,291 views
The interior work on the house begins. Stage number one, the floor. What is the floor in a private house, how many layers does it consist of, and why is all this needed at all? I will try to answer all these questions in this video. All stages of work on the installation of the floor up to the final screed, leveling, waterproofing, insulation. laying the heating. I am trying for the first time to install a pipe for a warm floor with my own hands, pipes for heating radiators in layers of insulation. And I am doing a lot of other things for the first time. 00:00 Semi-dry floor screed 90 square meters. 00:28 Preparation of rough floor screed. 03:09 Selecting insulation for the floor. 04:26 Laying insulation on foam glue. 06:26 Laying heating pipes in insulation. 09:44 Laying the second layer of insulation. 11:38 Do-it-yourself installation of a pipe for a warm floor. 15:50 Heating a private house. 18:13 Floor screed with someone else's hands. 19:48 What's next? #construction #DIY #project500