121,404 views
We continue the restoration of the tractor cabin. Filling and consolidation with resin of the broken part of the roof. I continue the dismantling of the cabin, namely the doors and windows. The goal is to prepare all the supports for the next step which will be painting. Shots: January 5-11, 2020 Be notified of future videos: http://bit.ly/1NY4rCX ► Support me TIPEEE: http://bit.ly/SOUTIEN ► THE SITE: http://bit.ly/le_site_chaine_agricole ► INSTAGRAM: http://bit.ly/insta_chaineagricole ► FACEBOOK: http://bit.ly/FB_comprendrelagriculture ► TWITTER: http://bit.ly/twitter_chaineagricole