72 views
It all started with a sketch sent by a customer, leading me to meet the Volognes-Menuiserie workshop, in the countryside. Over a coffee, we drew the first sketches together to integrate the motor and the locking system. Once the motor was presented, the adjustments to the box were made. Everything was ready for installation. In a single day: removal, installation and commissioning. After arranging the chassis, we took care to level it perfectly before fixing it using direct fixing screws. With the door placed on the hinges, I was able to complete the wiring and install the motor. The final tests confirmed that it was working properly, and the commissioning was a success. The company Vincent Patrice ECS Électricités prepared the ducts, provided the power supply and made the necessary drillings upstream. I often appreciate the quality of its temporary collaborations with contractors who work conscientiously.