248,184 views
I used PowerPoint to recreate the two right sides of the three-panel LCD of the new Marunouchi Line 2000 Series train, excluding the advertising monitor. I'm both happy and sad that all 02 Series trains will be replaced by 2021. The amount of work required to create the three-panel LCD was about twice as much as usual, so it was hard to see the end in sight, but I managed to post it. There were some parts where the Chinese and Korean instructions on the Tokyo Metro official website and those used on the LCD differed, so it was really a painstaking task to handwrite each character into Google Translate and extract the language. There are few drivers who set the start of the first train, so I think the pre-departure broadcasts are a rare sight at this stage. At the end, I've added a broadcast for Nakano Fujimi-cho that I happened to record, so please enjoy it. I have placed a link to Railway Mobile (https://www.te2do.jp/) at all content display times for easy understanding. I have also created Sesame Micro for the Marunouchi Line 02 Series wide LCD, the Yurakucho Line, and the Chiyoda Line, so please take a look. Please refrain from unauthorized reproduction of the video. Software used: PowerPoint 2016 Recording device: TASCAM DR-07 mark2 (Recording date: 2019.2.28) Contact: Twitter @shunshunLCD ( / shunshunlcd )