Krandienst Schulz and Rolf Riedel during the demolition and reassembly of elevated railway bridges at the HH Ohlstedt underground station in June 2016. A Demag AC 500-2 from Krandienst Schulz and the MB 4160 MP 3 Titan with Nooteboom 2/4 low loader from Rolf Riedel were used. The video shows the process from the arrival of the crane to the rigging, the excavation of the bridge/bridge parts and the loading onto the low loader with shunting before transport. Installation of the new railway bridges delivered by Thömen with the AC 500-2. ---